|
|
|
|
LEADER |
01240nam a22002897a 4500 |
003 |
HCCL |
005 |
20161221134626.0 |
008 |
161221b xxu||||| |||| 00| 0 eng d |
020 |
|
|
|a 085226917X
|c Rs.85.00
|
040 |
|
|
|a HCCL
|
041 |
|
|
|a English
|
082 |
|
|
|a 658 Sh45
|
100 |
|
|
|a Shenoy,G.V.
|
245 |
|
|
|a Operations research for management
|c by G V Shenoy, U K Srivastava, and S C Sharma
|
250 |
|
|
|a 2nd ed
|
260 |
|
|
|a New Delhi
|b Wiley Eastern Limited
|c 1991
|
300 |
|
|
|a xv,398p.
|b 24cm
|
505 |
|
|
|a Linear programming, The transportation problem, Theory of games, Network analysis PERT/CPM, Waiting lines Inventory controlmodels, Replacement decisions, Sequencing models, Integer programming, Dynamic and goal programming, Simulation of management systems,
|
650 |
|
|
|a Management
|
650 |
|
|
|a Operation research
|
700 |
|
|
|a Srivastava, U K
|
700 |
|
|
|a Sharma, S C
|
942 |
|
|
|c BK
|
997 |
|
|
|c KohaHCC.1665
|d 1665
|
998 |
|
|
|a Heramba Chandra College
|c http://199.247.15.162:8000/cgi-bin/koha/opac-detail.pl?biblionumber=1665
|d 1665
|
999 |
|
|
|c 1665
|d 1665
|
952 |
|
|
|0 0
|1 0
|2 ddc
|4 0
|6 658_000000000000000_SH45
|7 0
|9 4847
|a HCCCL
|b HCCCL
|c GEN
|d 2016-12-21
|g 85.00
|o 658 Sh45
|p c7206
|r 2016-12-21
|w 2016-12-21
|y BK
|x DAta entered by Susmita
|